I am falling asleep as I type, so this will be brief.
Preparations for installation of the sewer lines continued today. The trenches are almost a full meter deep. I don’t know how this preparation could have been accomplished had it not been for Eduardo, our skilled scavajger driver.
We should be ready to begin installation of the tube (pipes) and the pussets (catch-basins) on Monday.
I like the way this photo captured the scene on my way home. You really should come here.
Good night.